← All MCP tools

Link task to event

link_task_to_event
WriteIdempotent

What it does

Record that a task and a calendar event are about the same thing. Use after confirming a suggestion from suggest_event_matches, or when the human tells you which meeting a task belongs to. Linking the same pair twice is harmless. Pass the score you acted on so the reasoning behind the link is preserved.

Parameters

NameTypeRequiredDescription
task_idstringRequired
calendar_event_idstringRequired

Done's event id (from suggest_event_matches or list_calendar_events), not Google's

scorenumberOptional

The matcher score you confirmed, if any

Annotations

The hints the server sends with this tool. A host reads them to decide whether to ask you before a call.

Read-onlyreadOnlyHint: false
Changes data in your Done account.
DestructivedestructiveHint: false
Only adds or reads; nothing already there is removed or overwritten.
IdempotentidempotentHint: true
Calling it twice with the same arguments leaves the same result as calling it once.
Open worldopenWorldHint: false
Touches only your own Done account.

Which tokens can call it

A connection made with OAuth has full access. A token from Settings → Agent access → Extra MCP tokens can be narrowed, and a narrowed token never sees beyond its project or workspace.

  • Full accessAllowed
  • Read-only tokenRefused
  • Single-project tokenRefused
  • Single-workspace tokenAllowed

Try it

With Done connected, ask your assistant something like:

“Link the budget task to Thursday's finance meeting.”

Connect Done to your assistant

One MCP endpoint per account, over OAuth or a token. Step-by-step setup for each client:

MCP setup overview →